Separation Plan V1

Objective

Define the initial separation strategy for the tool ecosystem:

  • what stays in this repository now
  • what is incubated here first
  • what is extracted later
  • what signals justify extraction

This plan is meant to prevent premature repo sprawl while still preserving a path to clean tool boundaries.

Core Principle

Separate by proven operational boundary, not by conceptual enthusiasm.

A capability should remain in this repository until:

  • its contract is stable enough
  • its runtime/storage needs are distinct enough
  • its reuse beyond this repo is real enough
  • local iteration is being hurt by coupling

Current Repo Role

For now, this repository should act as:

  • control-plane incubation repo
  • design-lab repo
  • contract-definition repo
  • orchestration incubation repo

It is the right place to define and test:

  • core contracts
  • design iteration
  • runner semantics
  • tool boundary discipline
  • first orchestration workflows

What Stays Here Now

These should remain in this repository during the current phase.

1. Shared Contract Layer

Includes:

  • core-contract-spec-v1
  • DAG model
  • message envelope
  • packet taxonomy
  • versioning rules

Reason:

  • this is the central anti-drift authority

2. Design Iteration Tool

Includes:

  • design review logic
  • validator definitions
  • design-iteration DAG
  • findings and gap emission

Reason:

  • it needs tight access to contracts, workflow specs, and critique artifacts

3. First Orchestration Runner

Includes:

  • workflow DAG execution over existing tools
  • event log
  • failure handling
  • packet movement

Reason:

  • early orchestration should be developed close to the tools it wraps

3a. Plan Quality Score

Includes:

  • plan-quality policy
  • candidate plan comparison logic
  • best-plan ranking semantics

Reason:

  • this needs tight coupling to the evolving planner contracts and design-review rules before extraction

4. Wrapped Existing Capabilities

Includes:

  • current question capability
  • current research capability
  • current planner capability
  • current governance capability

Reason:

  • these should first be wrapped and observed before extraction

What Is Incubated Here First

The immediate incubation targets are:

  1. design-iteration-tool
  2. orchestration-runner
  3. plan-quality-score
  4. wrapper contracts for existing question/research/planner/governance capabilities

These should become operational before repo extraction decisions are made.

What Gets Extracted Later

These are likely later extraction candidates, not immediate ones.

1. evidence-search-tool

Reason:

  • likely distinct retrieval logic
  • likely distinct source normalization and ranking behavior
  • useful outside this repo once stable

2. memory-tool

Reason:

  • distinct storage and retrieval model
  • cross-project reuse potential
  • should remain separate from orchestration state

3. research-tool

Reason:

  • distinct runtime and evaluation behavior
  • likely to need its own execution environment and experimentation cadence

4. planner-tool

Reason:

  • extract only after planner packets and DAG semantics stabilize
  • current planner concepts already exist locally and should be hardened first

4a. plan-quality-score

Reason:

  • extract only after plan-model and scoring-policy contracts stabilize
  • this tool should remain close to planner hardening until valid-plan comparison semantics settle

5. governance-tool

Reason:

  • extract only after packet boundaries are real and the oversized harness can be simplified against those boundaries

What Should Not Be Separate Yet

Do not create these yet:

Separate docs-only repo

Reason:

  • docs will drift unless code and contracts are already stable

Separate design-iteration repo

Reason:

  • the tool still needs direct local access to contracts, validators, specs, and workflow artifacts

Separate shared-contracts repo

Reason:

  • contract shapes are still being actively refined

Extraction Triggers

Only extract a capability when one or more of these are true:

Trigger 1: Stable Contract

  • packet contract is no longer changing in major ways

Trigger 2: Distinct Runtime

  • the capability needs its own execution environment, scaling model, or dependency stack

Trigger 3: Distinct Storage Model

  • the capability needs storage patterns materially different from the current repo

Trigger 4: Cross-Project Reuse

  • the capability is needed across multiple repos or problem domains

Trigger 5: Local Coupling Cost

  • keeping the capability here is actively slowing iteration or causing drift

Trigger 6: Clear Ownership

  • the extracted capability can have a clear canonical owner and upgrade policy

Repo Extraction Order

When extraction becomes justified, the most likely order should be:

  1. evidence-search-tool
  2. memory-tool
  3. research-tool
  4. planner-tool
  5. plan-quality-score
  6. governance-tool

This order reflects increasing architectural sensitivity.

Why Design Iteration Stays Here First

The design-iteration tool is the mechanism that helps determine future separation.

That means it should remain close to:

  • the contracts it critiques
  • the workflow DAGs it reviews
  • the build plan it updates
  • the current mixed-capability implementations it observes

Extracting it too early would weaken its usefulness.

Why Docs Stay With Code For Now

Right now:

  • contracts are evolving
  • DAG semantics are evolving
  • validator rules are evolving
  • extraction decisions are evolving

Keeping docs near the code and control-plane artifacts reduces drift while the system is still being shaped.

Role Of The Design Iteration Tool In Separation

The design-iteration tool should help refine separation later by:

  • detecting mixed responsibilities
  • detecting duplicate authority
  • detecting missing handoff contracts
  • grouping extraction-worthy gaps
  • emitting next-step questions about separation

But it should not be the sole authority for the first separation plan.

The first separation plan is still a bootstrap human decision.

Bootstrap Separation Rule

Initial separation decisions should be:

  • human-locked
  • contract-backed
  • revised later by design-iteration findings

This avoids letting an immature critique tool become prematurely authoritative.

First Review Checkpoint

Before any repo extraction is approved, the following should be true:

  1. core contracts are locked
  2. design-iteration validators exist
  3. runner can execute at least one real workflow over existing tools
  4. observed friction justifies the extraction

If those are not true, extraction is too early.

V1 Success Criteria

This separation plan is working if:

  • the repository remains a productive incubation space
  • tool boundaries get clearer over time
  • extraction happens later and cleaner
  • docs stay aligned with code and contracts
  • the design-iteration tool produces useful evidence for future separation